Schneider Electric charger evidence

Schneider Electric SE Charge Pro OCPP compatibility evidence

Review anonymized operational observations from 5+ chargers and 40+ completed sessions. Evidence was reviewed on 14 August 2026 and is not OCPP certification.

Manufacturer
Schneider Electric
Model
SE Charge Pro
Protocol observed
OCPP 1.6J
Observed installations
5+
Completed sessions
40+
Metered sessions
30+

Observed production behavior

Only reviewed, model-level observations are listed. Missing evidence never counts as a failed capability.

Observation 1

Accepted OCPP 1.6J boot and recent online-state evidence

Observation 2

Completed charging sessions with transaction-scoped energy readings

Observation 3

Configuration, remote control, and charging-profile responses observed

How to interpret this evidence

Operational observations reduce rollout uncertainty, but they do not replace model- and site-specific acceptance testing.

Observed means evidenced

The listed behavior appeared in reviewed, anonymized production aggregates for this model.

Unlisted means unclassified

A capability absent from this page has not been classified by this evidence. It is not automatically unsupported.

Firmware still matters

Firmware, OCPP configuration, network access, connector state, and vendor settings can change behavior.

Test the required workflow

Verify the exact commands, metering, Smart Charging, and recovery behavior your planned deployment requires.

Controlled compatibility report

SE Charge Pro compatibility questions

Answers stay within the reviewed evidence and the limits of model-level observations.

Is Schneider Electric SE Charge Pro compatible with EVCharge.mobi?

EVCharge.mobi has reviewed anonymized operational evidence from 5+ Schneider Electric SE Charge Pro chargers, including accepted OCPP 1.6J boot behavior and completed charging sessions. This evidence applies only to the observed models and conditions; it is not OCPP certification or a guarantee for every firmware and configuration.

What Schneider Electric SE Charge Pro behavior has been observed?

Accepted OCPP 1.6J boot and recent online-state evidence Completed charging sessions with transaction-scoped energy readings Configuration, remote control, and charging-profile responses observed Capabilities not listed in the reviewed evidence remain unclassified.

Should I test Schneider Electric SE Charge Pro before deployment?

Yes. Firmware, configuration, network conditions, connector behavior, and electrical installation can change the result. Test the exact charger and required workflows before operational handover.